Skip to main content

Reply to "How's Precision Schedule Railroad (PSR) working for you?"

Dominic Mazoch posted:

As long as the Main Line has sidings so the trains needimg to LEAVE the yard can do so.  Pne of the reasons Englewood Yard tilted early after UP bought SP.

That is not a problem with a double track railroad which most lines around Harrisburg are.  Also we are talking here about a weekly traffic cycle on one railroad that is operating normally.  The Englewood situation is not a good example.  That mess was due to poor opertations planning in a merger of two railroads..

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×