Skip to main content

Reply to "How's Precision Schedule Railroad (PSR) working for you?"

In an earlier post, I had meant to type "time consumed" but my mind was going faster than my fingers can type. The example I was using was labor relations started going through the contracts with a fine-toothed comb under the direction of EHH. They were able to find wording in the contract we work under (the B&O) that there was language that enabled the carrier to pay deadheads however they wanted. So your deadhead in the pool went from the trip rate of whichever pool you were called in to time consumed...which is usually about 3 hours. I'd say was DH pretty frequently because the pools can get pretty lopsided  at times...and sometimes you DH both ways. That's a big difference going from the trip rate on a DH to $84.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×