Skip to main content

Reply to "How to convert fastrack switch to Command Control"

This was planned for over a year.  We had to design a new PCB, write instructions, and wait for the board to be manufactured.  The PC boards are due in next month (4 -5 month lead times).

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×