@Rusty Traque posted:
Rusty, That may be the case with my current layout. It is built in sections to be taken apart, but as much trouble as I have matching up the track for the lift-out bridge, I just built the track right over the joints between the benchwork sections. I thought of putting in junction terminals or plugs for the wiring, but decided against it. If I salvage any of it for another layout, I'll just cut the track and wires. I learn things on every layout build, that I want to do differently on the next layout, so I'll probably want to start fresh again.