Skip to main content

Reply to "Installing GS Shelving"

bruce benzie posted:

The connector pins are a big PIA.  To solve the problem I held one end in a needle nosed vise grip and increased the opening with a dremel tool, then swapped ends.  Also bevel the edges on the opening at both ends to go on the rail easier.

The only thing I do not like about the shelving is the 3 rail.  It is display shelving, two rail is sufficient.  I have mentioned this to Glen, but to no avail.

bruce

I recently installed my first set of GS shelving and agree with this.  For some reason all the locomotive pick up rollers seem to have much more "springiness" on the shelves then on the layout track. Plus they keep dancing off the sides when trying to set a unit in place. Big articulated steam seems to be more so.

 Don't get me wrong, I custom made Oak shelves that are nice and since installed the GS I don't think I'll go back to anything else. 

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×