Skip to main content

Reply to "Inuslation Foam top vs Plywood"

I have 2 small conventional layouts.  Both are hollow core door slabs on sawhorses. On the earlier one I tried weatherstripping on each tie (Marx 034 track) then an occasional screw. Works ok.

On the second one, I bought commercial foam roadbed from the bay pretty cheap. I glued it down with spray adhesive. I added the track, (marx 034 again), connected everything together with Marx track clips. Then I put a piece of two sided tape on one clip at each joint. The tape came from a cheap window winterizing kit. No nails or screws. Quietest layout yet. Been running trains on it since before christmas with no problems. 

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×