Skip to main content

Reply to "Isolate a siding"

You said that some people use 2 plastic joiners at the ends of the track segment, while others use one.  One on the center rail is all you need, with a switch connected to the center's power feed.   I install a 2nd plastic joiner on an outer rail only if I need block occupancy detection for signals....  TO CLARIFY: I am talking about at one end.  Given a siding with 2 connections, repeat twice. 

Last edited by ScottV

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×