Skip to main content

Kitbashing Lionel 450 signal bridges to span 3 tracks

I posted a rough step by step description of this process over on "What did you do on your layout today?".

More people than normally look over there might be interested in trying this. 


I wasn't feeling like actually doing work on the layout, so I did a little project at the workbench. I needed two, 3 track signal bridges. This is a regular Lionel 450, 2 track bridge, with a leg removed. I also took the signal heads off.

IMG_6585

Years ago, back at enterTRAINment, one of my guys took two bridges and created this 4 track monster, which I have no use for now.

IMG_6586

So, I lopped off one track's worth, and paired it with the one legged bridge.

IMG_6588

I had to get a little creative connecting the two pieces, by soldering them and grinding off the excess. It looks a little rough close up, but once I paint it and add the new signal heads nobody will notice.

IMG_6589

Here's the finished bridge.

IMG_6590

The odd leg was added back to the cut down quad, and then there were two triples!

IMG_6591

They will be placed at either end of the Hoffman interlocking...

IMG_6592

and carry multiple masts with multiple heads.

IMG_6593

Just like this.

TRAINS_0278

Feel free to ask questions.

Last edited by Big_Boy_4005
Original Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×