Skip to main content

Reply to "Kitbashing Lionel 450 signal bridges to span 3 tracks"

pennsynut posted:

Very nice work Elliot. I would have considered doing a splice project if I had 2 450's to work with.  Instead, I looked at the PRR drawings online and scratch built one with wood.  It's not as nice as yours but it works.  I think photos of it are on my "not quite a complete redo . . . " thread.  You have good skill sets Elliot.  Thanks for the tips.

Thanks Pennsynut! I had accumulated quite a few of the 450's for enterTRAINment at the Mall of America, so that was the easy part, digging them out after a quarter century. As for my skills, I used to build architectural models for a living, and have been doing trains seriously for more than 40 years. You pick things up along the way. I'll go check out your topic.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×