Skip to main content

Reply to "Lance Junction - Updated 10/6/2020"

@Lancer posted:

72B14449-74E7-4920-845E-3B89246482EF6FEF89BD-52AF-473A-8A9A-E090BC2ABC5B
Test fitting the lift bridge today. Hoping to start getting some track laid here soon. 

Hard to tell for sure from the pictures, but it looks like the hinge will bind after track has been laid on the table.  As mentioned in an earlier post, you do need to design something so that the hinge pivot point is above the rails.  Alternative is to build it as a lift-out. 

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×