Skip to main content

Reply to "Large staging peninsula needs a new home."

If you clear out the entire room,  all the benchwork and track is yours no charge.

Dumpsters are available for any debris.

The loop is comprised of four 8' straight modules, one X module and four curved modules.  The loop could be  turned into two 90 degree corners with the four 8' modules to connect as desired.

The modules and legs are bolted together.  The decking is 1/2" Homasote over 3/4" plywood.  All legs have adjustable feet on coasters.

Plus there is aprox. 120 linear feet of conventional benchwork around the wall.

There is an abundance of track and switches on the main around the wall platform.

On my last visit I did not see any ballast applied.

Contact info in profile.

Last edited by Tom Tee

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×