Reply to "Latest progress on Chugman's Layout New Holiday Video Added 11/25/2018"

I have been working on my river valley area lately.  I discovered that in order to continue shaping the sides of the valley I had to complete things on the sides.  I am running the plaster up to the bottom of the retaining walls and I did not have them done yet.  But before I could add the retaining walls, I had to build a highway underpass in the retaining wall.

Here are some pictures of that process.  I made a cardboard template of the curvature on the single track so I could cut the right contours for the sides of the underpass.  

underpass2underpass3underpass4underpass5underpass6underpass8

The next pictures show the Masonite installed on both sides.  I made the underpass 4" high and 5" wide.  It will be an old two-lane blacktop that connects with the road bridge running across the river valley.

underpass10underpass11underpass12

The last pictures are after I have sprayed a coat of aged concrete on the retaining walls.  I have also plaster up to the wall on the right side of the valley.  Now I can continue to work on the plastering in the valley.  I have to paint and glue strips on the top and joints to finish this section of retaining walls.  Later I will do some additional weathering, add vines and grass, and some advertising posters in selected spots.

underpass13underpass14underpass15

Now I need to get back downstairs and get busy.

Art

Attachments

Images (12)
  • underpass2
  • underpass3
  • underpass4
  • underpass5
  • underpass6
  • underpass8
  • underpass10
  • underpass11
  • underpass12
  • underpass13
  • underpass14
  • underpass15

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×