Skip to main content

Reply to "(UPDATED) The 48 Club *** Announcing Division 59 Membership ***"

@TheLloyd posted:

IMG_2393

4x8' 0 gauge with some 027 can run 3 cabs max with 4 parking dead-ends for a total of 7 engines to switch out. It's so far an operational layout with constant power to all turnouts, designated power to all UCS and 6019 sections, and with lighting/buildings to come later. It is my first layout and I had no idea what I was doing...I just went for it. This layout use to be 16" off the floor and fold up on hinges when not in use. The new roller benchwork is way better...up higher and the layout is getting some needed TLC now that I can see it better Roller benchwork is comprised of 4 corner columns and 2 deck frames that bolt together at the corner columns.

What a great layout. Looks like a lot of fun to operate.

Bob

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×