Skip to main content

Reply to "Layout design"

You can make that work.  I counted 16 track sections at about 10" each = 160" approximately.  Maybe it's a bit more, which would help.  It can be tricky starting the grade right after the switch, which doesn't help.  it'll be a bit steep, but what the heck, it's better than not building it.  Good luck.

7"/160" = 4.375% grade

 

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×