Skip to main content

Reply to "Layout entry point - hinged/removable sections"

Very impressive!

 

All of the spans that either lift up, drop down or are removable from the main permanent layout leaves me asking a few questions:

 

How does the track on the movable section connect to the permanent track? Is there no physical connection between the tracks? Do they simply perfectly align and yet have a miniscule "gap" between the adjacent rails?

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×