Thanks for all the great feedback guys!

I have been completing more of the construction, here are some additional photos. At this point I have completed the framing, legs, girders, cross braces in the bench work, and covered it with OSB sheeting. Next step is to add the homasote. I intend also to add some additional elevation using dimensional lumber, and foam.
I also found a Lionel lift bridge I intend to use in the harbor area.
The gap you can see in the second to last photo is the access to the breaker panel that is behind the framed poster. This will have some lift out bridges to provide better access with less reach.