We have 2 "lift OUTS" at the front of our layout on two different levels. You could just modify your bench work because that would be a huge lift up or out section. I think you would want just the bridge themselves to be moved. Maybe you could make it so the bottom is hinged to swing down and the top swing up? This is what we did in a similiar situation.