Skip to main content

2013 Layout progress review pics and video

After Jealously Wink

watching everyone build their layout for the last 3 years and running their trains I Finally finished up a 2 1/2 year Honey dew list in the new house and having the basement 90% done like everyone recommended here. I went out and bought some wood yesterday and got started this morning. I recruted one of my freinds from the club,Dave Neuman to help me get the base started .

My favorite railroad and engines and terrain is the Norfolk and Westerns , so i ve planned some big mountains as well as a giant coal mine , and various services they provided.


Around the wall 4-5 feet out ,with 2 - pininsulas (116" radius.) 32 "minimium walkways. Not much of a drawer but this is the basic layout so far . Also threw in some nice winding benchwork to mimick the pininsulas. WE built standard benchwork for square areas and the L girder to let boards run long, then cut radius to match following side. I kept the girder back 13" from ends,(cantiliver) I will eventually like to put cabinets in some spots and finish from bottom of trim board to floor.
Has anyone have suggestions as to how I would finish from bottom of trim board to Floor?

all 3 layers
PH1Layout.rrt


















Attachments

Last edited by Patrick H
Original Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×