Skip to main content

Reply to "2013 Layout progress review pics and video"

I ve been going over this in my mind even before they poured the concrete in the basement. LOL

Yes it is true , The first set of pics was all done in one day ,Saturday. Its a mixture of standard framing in each anchor point then running 2 L- beams to connect them. Drop all your laterals on top and cut them to radius shape you want.We started with 3 levels from base down, to give it some drop downs for bridges and canyons etc, now will cover with 3/4 , but not screw down yet,lay track, cookie cut around track , then raise tracks with 3/4 to different heights.

I have been trying to figure exactly what i will finish underneath with.

I could use more ideas. I am going to check oput the bead board to see if can make the tight radius.

After a couple suggestions so far. I was thinking maybe that .88 a sq ft prefinished wood flooring stood up on end and attatched to trim board. Then use a panel cap.

I would like to find more pics of how others have done it.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×