Skip to main content

Allegheny Crossing - 10/8/2022 - Intro Video featuring several locomotives and freight consists

Hello,

This is my first post on the forum, but I have gotten a lot of advice already from reading it.  I have been in the hobby most of my life and have done several layouts over the years, but have never had a space for a permanent layout.  Now I am working on creating a long term, permanent layout in my basement.  In the past, I have always gone the traditional route with lionel tubular track and conventional control.  With this layout I want to use gargraves track, ross switches and DCS control.  I have designed a layout using RR track software and have included it here.  The black track is the bottom level.  The blue track is the upper level and the red track is a grade going from the bottom to the upper level.  According to the software, the grade is 3.4%.  I have designed the lower level with minimum 072 curves so I can run anything there in the future.  The upper level and the grade I went smaller (063, 054, 042) due to space.  I would love any suggestions, advice or critique.  Since I am going to be new to using gargraves, ross, dcs, etc, please let me know if what I have designed won't work in reality.  Thanks in advance!

Layout Design

Attachments

Images (1)
  • Layout Design
Last edited by Michael Cimba 040217
Original Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×