Skip to main content

Reply to "Allegheny Crossing - 10/8/2022 - Intro Video featuring several locomotives and freight consists"

NECRAILS and RSJB18:  Thanks for the advice on the switch access.  I didn't think about that being a problem, but I can see why it would be.  I reconfigured the layout and moved all the switches on the upper level so they were more easily accessible. 

I did a layout a couple years ago that was higher, closer to 48" for the lower level.  I decided that was too high.  So, I decided to lower this one.  I do have small children and that was definitely a consideration.  Also, because the layout is so wide I wanted to have as much arm reach to the center from the sides that I could.  I definitely understand the issues of bending over and doing wiring underneath.  I will figure out what works best for my situation.

Thanks again for all the great advice!  Here is my reconfigured design.              

Attachments

Images (1)
  • Michael's Layout_REV C

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×