Skip to main content

Reply to "Allegheny Crossing - 10/8/2022 - Intro Video featuring several locomotives and freight consists"

Good evening,

I have been working in the train room the past several months and I thought I would give a brief update of my progress so far.  The lower level of the benchwork is almost complete.  I still have to add a small extension on the right side.  The second level benchwork and the grades will be added later.  The entire layout has been traced on the benchwork so I know how everything should fit in real space.  The latest project is creating a framework on the back wall for the wrap around backdrop.  Next will be to mount 1/8" masonite to the frame and after that mount the backdrop.  After that is complete and the lower level benchwork is finished I will be ready to start laying track and roadbed on the lower level.  In conjunction with that I have to finish my electrical plan.  My goal is to hopefully have something at least running on the lower level by Christmas.  Hope you enjoy and hope you are all staying healthy and well!  God bless!

Attachments

Images (1)
  • Train Room

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×