Skip to main content

Layout Update Video by Chris A -

Finally got things cleaned up enough to shoot a short video showing the progress.   Decided to narrate to describe the layout design so that you don't have to try and figure out what I decided to build...  

The whole layout has been built in irregular shaped modules which can be taken apart and moved....  Yes it's alot more work building it and wiring it this way, but I seriously doubt I will be able to start another layout from scratch....  So far, it's worked out well, the engine service facility, classification yard, canyon, and the 2 level section joining the yard to the service facility were built back in 2006 thru 2008 and then moved after my dad passed away 2014...   Thank goodness for the module concept as I was able to get those 3 modules placed, set up and running in less than 2 months.    Video link is attached.  

https://youtu.be/o9ULr0LWk6k

 

Original Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×