Skip to main content

Reply to "Layout wiring"

The opening in your benchwork can also define a block boundary since the tracks need to be cut. A block on the right hand side could be extended through the switch and power the right side, the left side is obviously picked up from the left side block. Seems like most of your wiring runs can be limited to the back half. That one short piece of track on the siding that extends beyond the opening may be a little tricky to run wires to because it needs to be on the same block as the rest of the siding for the watchdog scheme, or you could leave that piece unpowered if you don't think you would run an engine that far down that siding.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×