Skip to main content

Reply to "Layouts do fill up, right?"

The current layout is filled up.  We've added as many sidings & yards as the space will allow and built several shelves.  We've even added a new siding off of one of our passing sidings and named it "engine overflow".

I'm still buying but at this point when a new addition arrives it means something else needs to be stored (for now).

I'm currently house shopping with plans to have the majority of the finished basement dedicated to a large layout which will allow for more trains.

I don't have a limit, but as I've gotten more and more items I get more selective.  And, if I buy a newer / better version of an engine, I sell the older one.  I plan on selling some excess rolling stock as well.

The shopping / buying won't stop as long as I have the money to spend and as long as new and better items get made.

 

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×