Thanks, Pops.
An update is due soon.
SIRT told me when I installed that bridge to start work on detailing and weathering.
I am about to do that.
The bascule portion was largely constructed by an architect who kitbashed at Altas O truss bridge. I added some lower supports and the two truss bridges on either side. O scale track was removed and three rail added. The bridge operates, albeit manually.
Eliot