Another style that people have done is to have it lower straight down from the ceiling on 4 pulleys. This is great if you have a high enough ceiling and it doesn't tip everything. If you do it right, you can even leave the trains on the track.
A little trickier to do and rig so it goes up by pulling one line, but you could probably find plans somewhere.
|