Skip to main content

Reply to "Lionel Barrel Loader Accessory; Using it with a Lionel Barrel Ramp Operating Car"

bmoran4 posted:

Possibly the OTC would help in conjunction with cut to size track sections.

I believe you are correct.  When I had my Super O layout, back in the seventies, I did exactly what the OP is describing by using Super O operating-car activation blades placed in the track at the appropriate spots.

I have never seen one of those OTC connectors, but it looks to me like they would accomplish exactly the same thing.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×