Steve ,
I have a neighbor that most likely has one , and I will seek him out and go from there . At this point , I am going to make sure that the transformers are phased , and itβs not going to ruin me if the fast track doesnβt get sorted out as Iβve always been dubious of it anyway because of space . Redundancy is the main thing at this point as I can always go back to the tubular layout ( which I have ), or , worse case 0-27 of which I have three o-27 ready to run sets that are pristine .
the 0-31 radius , as well as the 0-31 switches are the constraint to pulling that back out as I have two steamers and a GP-20 Lionchief that require that as a minimum curve .
I most appreciate your ( and others help ), on here regarding this issue and will post updates as progress is made πππππππππ