Skip to main content

Reply to "Lionel Hudson "Yellow Belly" 6-18043 slows at spots on layout"

If it starts acting up again, you do not have to pull up the track. There are two ways you can improve connectivity on track that is already in place.

Solder a tiny bare wire jumper on the side if the rail, bridging the gap between two pieces of track just above the roadbed/ties. Be careful not to melt the roadbed/ties

Or drill a hole through the roadbed/ties and through the table top. Push the wire up from the bottom or down from the top, and solder a drop wire to the side of the rail.

Last edited by RoyBoy

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×