Skip to main content

Reply to "Lionel Switch Controller (ASC)"

I don't think a Y cable is possible.  The LCS PDI comms are all point to point.  115.2Kbaud.  Each box receives a PDI packet and, if it is not addressed to that box, re-transmits it to the next box it is connected to.   A Y cable would introduce possibilities of packet collisions.

Have you measured latency between the Legacy Base and LCS box #37?

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×