The boiler needed to be shortened by roughly 1/2”. The walkways in turn needed to be changed. The boiler has already been shortened and the smokebox cover installed. In addition to the boiler being shortened it also had to be reshaped. The lower half needed to be made round and allow for the new piping from the feedwater heater.
|