Skip to main content

Lionmaster T1

Greetings, I finally got around to replacing the traction tires on My Lionmaster Pennsy T1  Put it on the tracks, and tried programming it.  Finally got the "Rail" sounds working.  Then to no avail, no matter what I tried it pretty much has one speed, wide open. My first thought is that I'm not programming it in the proper way.   After doing a search I saw one response that it is the TMCC engines themselves when using TMCC control.  Twenty years ago when I got a Cab1 setup I remember being amazed at how slow I could run it as opposed to conventional.  I tried setting my cab2 to both cab1 and tmcc neither setting helped. I was using the T1 while relaying track last year under conventional  control and it was fine except for traction tires.  It'll be a shame if I truly can't control the speed with my Cab2 remote.  While running it conventionally it randomly does some of the rail sounds if I remember correctly.

Signed,

Despondent

Original Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×