Skip to main content

Reply to "LIRR has been around longer than...."

Continuing on the subject of the Long Island Rail Road:

Beginning in 1910, 33 pairs of PRR boxcab electric DD1 locomotives moved trains from Manhattan Transfer (New Jersey) into New York Penn Station and through the East River tunnels to Sunnyside Yard. In 1924, most of the DD1s were transferred to the LIRR and hauled empty passenger trains from Penn Station to Sunnyside Yard. They ran on 650-volt DC third rail. Each pair weighed 313,000 pounds, developed 55,500 pounds tractive effort and had a rating of 1,580 horsepower (continuous) at 58 miles-per-hour. The LIRR scrapped most of its DD1s between 1949 and 1951 with two pairs remaining in 1962. The last pair was donated to the Railroad Museum of Pennsylvania in 1978.

Pictured below, on the trestle of my 10’-by-5’ layout, which does not look at all like Sunnyside Yard, is my MTH Premier model of LIRR DD1 electric locomotive #352 (20-5516-1) with PS-2, purchased about 2002.

MELGAR

MELGAR_LIRR_DD1_352_02MELGAR_LIRR_DD1_352_04

Attachments

Images (2)
  • MELGAR_LIRR_DD1_352_02
  • MELGAR_LIRR_DD1_352_04

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×