To all,

I asked Steve Lynch from the Trainsarefun website about the “Longhorns “ pictured above, and here was the reply:

 

 M3 ex-9775 converted to  #E775 alcohol/sandite car 2018. Photo/Archive: Jeff Erlitz


The LIRR currently uses two M-1 cars to "slime" the rails during falling leaf season. Modified M1's 9401 & 9591 (now E401 & 591) are utilized sandwiched between a pair of MP15's.They operate entirely at night and are serviced at Richmond Hill during the day.

There are also leaf crusher trains. These consist of two MP15's and gravel hoppers. They crush the leaves on the Oyster Bay , Pt. Jeff, Montauk, and Greenport branches. These trains are based at KO and Wellwood siding and operate at night."  

Both sandites and leaf crushers have run on the branch simultaneously, and have been on the branch with both. Leaf crushers are operated on the branch to pulverize leaves that may be wedged in the circuits for the crossing gates. If leaves are not crushed, the potential for leaves to impede a circuit and crossing gates to stay up while a train goes through a crossing increases. All leaf crushers are run at the direction of the train dispatcher.Information courtesy: Ben Jankowski, Oyster Bay RR Museum

 Steve 

 

Paul, I hope that gives a little background. I learned something new too!

Andy

 

 