Skip to main content

Reply to "Long Island Rail Road-Oyster Bay Branch"

Thanks John, I'm enjoying the process. I look forward to the steps ahead. I should be installing the retaining walls this weekend. I also have some plate girders to install. Then I'll continue to wire up the power drops. Most of the switches will be hand thrown. I think that will bring me closer to the action. 

 

Andy

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×