Skip to main content

Reply to "Long Island Rail Road-Oyster Bay Branch"

I'm starting to ballast the yard. Before I do that, I want to raise the ground up, being that yard tracks are typically more at ground level than not. I'm cutting and fitting 3/16" foam core to raise the ground up. This helps minimize the amount of ballast needed, and gives me the look I want. After the foam core is in place I'll paint it earth brown as I did with the Homasote on the rest of the layout, then apply ballast. Because yard ballast is grimier than the mains, I will leave it black, unlike the brown wash I gave the mains when I glued it down. Thanks for looking. In progress...

Andy

Yard foam SYard foam1 SYard foam NW

Attachments

Images (3)
  • Yard foam S
  • Yard foam1 S
  • Yard foam NW
Last edited by Steamfan77

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×