Skip to main content

Max grade for MTH subway set?

I am adding a subway to my layout.  It will only feature one subway train running point to point over about 100' long with  20" change in elevation in a  few spots.  I need to compress the ramps as much as possible.  There will be vertical easements but the question remains what is a maximum practical grade percentage?

I will also be needing a  PS-2 MTH subway train.

Thank you.

Original Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×