Skip to main content

Reply to "Mianne bench 8 weeks"

Nessmuck posted:

Looks like crawling under that....for wiring ...could be a challenge.

I ordered mine with 42" legs.  I can sit under the table and do my wiring.  Not so much crawling.  Crawling starts after you load all of your empty boxes under the layout, and have to move them as you add on things that require wiring.  You would have that in whatever you do.

 

Interesting that no one pointed out that you will avoid a very big mess when you try to cut and saw raw material.  My 12 x 14 was ready for tabletop in about 4-6 hours.  What is the cost of your labor.  As I mentioned before, I think you will be thrilled.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×