Skip to main content

Reply to "Mianne bench 8 weeks"

Dear Forum,

We moved into our new home in 06/30/15.

My wife Patty told me the 2 car garage would be the perfect train room. I agreed!!

After about 2 months of prepping the layout room I contacted Tim Foley and asked him to design the benchwork for my 12x18 O Scale 2 rail layout.

Within 24 hours he sent me the detailed plan and cost of the project.

Tim and Lynn delivered the benchwork at the TCA York meet in October of 2015.

I put the benchwork together in November of 2015 and I completed it within 11hours using nothing more than a Phillips head screwdriver !!!!!

Tim and Lynn were great to work with

and has made a happy “little” boy at 62 years old !!

I would still be the design stage if it was not for the Mianne product.

 

I have some photos attached of the installation and progress of the layout.

Money well spent!!!!

Regards,

JohnB8E45683-B4D4-46BE-AECC-A0383785B0D875961B50-7A74-424F-B853-ED275ECF5B2B57F5ED75-EC78-4261-8203-FEC40AA375E7C78D0B6F-2B2F-40DB-9CD4-208CCCD50232

 

Attachments

Images (4)
  • B8E45683-B4D4-46BE-AECC-A0383785B0D8: August 5, 2015
  • 75961B50-7A74-424F-B853-ED275ECF5B2B: November 4,2015
  • 57F5ED75-EC78-4261-8203-FEC40AA375E7: April 2,2019
  • C78D0B6F-2B2F-40DB-9CD4-208CCCD50232: April 2, 2019

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×