The waist high water meter was raised a couple of feet then covered with a full size PRR smoke box keystone emblem which now provides clearance for rail access to a staging area in the shop and a whole new town and 8 track TT.

IMG_7919IMG_7920IMG_7932

Additionally, the tank style water heater was switched earlier to a wall hung tankless water heater hug in an out of the way area below the bathrooms which provided room for an additional town and yard.

An infrastructure upgrade we made earlier was to convert an obtrusive vertical 275 gallon fuel oil to a 275 gallon under the layout horizontal fuel tank to make way for a large passenger station and yard covering the entire new out of the way tank.