jerrymouse25 posted:Bossman284 posted:Bridgeboss Jim posted:3rail 2 posted:Hi Donald. I always liked how you added some nice finishing touches to your Diesel Facility, great job.
Just so everyone knows, Ive had several requests over the last year for this facility and have decided to bring it back, however w several changes, improvements, and options. It will offered in kit form only, unpainted, and painted, similarly as I offer the train sheds. Assembled was always a bear to ship due to all of the intricate parts. Watch my website for updates and status. Thanks, Jim r
This is great news. Any estimate on when these will be available to order?
Bill
Checked the bridgeboss site: nothing new to report- still "coming soon" hoping this means some really cool new features
Hi Everyone, Ive had so many inquires on the New Engine Facility that id better get moving along w the design. I will be showing updates on the front page of my website as I progress. It will be available in single, dual and 3 track configurations and in 24, 36 and 48 inch lengths. Will be all modular construction lending to a very easy assembly process. Will have plenty of options available.
Thanks,
jim r