Skip to main content

Reply to "Modern diesel Facility thread"

I've posted these pics on my build thread, but they're appropriate here too. The laser cut parts arrived for the engine house. 

I made a booboo on the on the machine shop side walls. I put the darn tabs on the wrong end. DOH! Stephen Milley has already cut and mailed me corrected ones. I spent a lot of time aligning those tabs on the CorelDraw Laser Cutting drawings. Too bad I wasn't paying attention to how the walls were oriented when I drew them.

EH Wall Parts 1

This shows why it had to be so darn long.

EH Big Engines Big House

Here it is sitting where it will be when it's actually built.

EH Where it Goes

I have another commission job I'm building before I can get to this one. I was just holding it together with clamps to see if my plans actually worked with the layout. Other than the tabs screwup, it fits exactly as it should.

I just contacted Crescent Locomotive Works to see about those service platforms. I don't have space between the tracks since their only 3.5" on center due to the Ross #4 switch ladder spacing, but I will need something on the outside tracks. I'll posting this entire build on my regular running thread, if anyone cares to see its construction.

https://ogrforum.ogaugerr.com/...ga-of-the-pandampprr

Attachments

Images (3)
  • EH Wall Parts 1
  • EH Big Engines Big House
  • EH Where it Goes

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×