Skip to main content

Reply to "Mounting Lionel Fastrack"

It depends on what's between the plywood and the track.  On my layout with green felt, there are 4 or 5 screws on the whole layout.  Lightly screwed in place, with no pressure on the track as cited above.

 

On my modular layout, I use ty-wraps to secure the track.  One goes thru a hole drilled in the plywood, a second tywrap cinches the first loosely from underneath.  The track can actually move about 1/16". Works perfectly, even transporting the modules.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×