Skip to main content

Reply to "Moving with a dead engine"

 That reminds me of a  trip where I was still training and we were waiting for a crew to bring a coal train off Wolfe Creek Branch here on the Pokey.

 The crew had already stopped us,since the branch came into single track to double track,because they were having a tough time pulling the tonnage.

 

 Well one of the brakeman went back to the third unit put it on-line and just like you mentioned ka-boom,but instead of a knuckle they got the draw bar on the rear of the third unit !

 Apparently the Engineer didn't notch down before the brakeman placed the isolation switch into run

 

 We nearly outlawed a hot time freight waiting for them to get things fixed !

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×