Skip to main content

MTH bridge track spacing

I'm considering purchasing the MTH 2-track bridge 40-1109.  Can fastrack be used?  Also, is the spacing between track flexible, or is it a set distance?  I'd like to know for SCARM modeling purposes.  Thanks

 

40-1109

Attachments

Images (1)
  • 40-1109
Original Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×