Skip to main content

Reply to "MTH CPR Alco S2 fixed pilots/paint"

 The loco is all together and I have been test running it on the layout. Final paint touch ups are still required and the un coupler lift bars require installation once I have some handrail stanchions in stock

  Some grinding with the Dremel tool was required to allow unrestricted rotation of the truck between the side frame castings and the insides of the pilot steps

 The only issues so far with the loco has been stalling on the fastrack switches when travelling slowly(still working on that)

 Here are a few pics

AlB386B749-806F-489D-B5F3-333DE34771D6820BBB0C-F4DA-4CC1-9739-A931E482A168197D99C0-D3ED-405F-A828-EBA3A93C624AA29BD435-B3D0-4227-B717-FB9B331F5D109C7A3534-9D0F-4B8E-817F-F602DB426FC647AABFD7-CF88-4F28-8D3C-0CEED121260B

 

Attachments

Images (5)
  • 707423C3-FC43-40F3-8FDD-87A8E84072DE
  • 782636BB-DFCE-44BC-AA46-CA8957407CB6
  • 203D3ECB-0B24-4DB1-A07C-9E28049B7A45
  • 5554ED2C-EC10-4389-8FD0-80ED1AC07E1E
  • 143DB4C8-029D-4912-A653-B3472DF9819B
Last edited by albertstrains

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×