Skip to main content

Reply to "MTH engine stalls on switches and isolation track"

IMO, the 2-rail/3-rail arrangement for the MTH convertible locomotives is a bit of a kludge.  I get lots of repairs in that are related to that cheap switching arrangement.    On PS/2 stuff with the polarity switch as well, I've had a number of people just have me remove both switches and hard-wire them to 3-rail operation.

Dave is, or course, right about the switching.  you lose some continuity to the wheels with the 2-rail/3-rail kludge as well.

Last edited by gunrunnerjohn

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×