Skip to main content

Reply to "MTH NW2"

I have converted the MTH RS27 (3) and SW1200 to 2 rail.    I started with unpowered units in all cases.    I think both models were Railking, but not sure. they are scale size (railking scale).    

The RS27s, I used P&D power mechanism with Alco RS truck frames which I think were Weaver surplus.   It was pretty simple, I just had to make body bolsters to mount the trucks to, and a motor mount in the body.    I did 2 for myself and a 3rd for a friend.

The SW120 (I think that is what it is) has actually been done twice.    The first I used an old All Nation switcher mechanism which had AAR trucks.    That worked fine.    Then I was given a box of 2 rail MTH parts that included two power trucks without side frames.    I changed it over to that and used the side frames that came with it originally.    The unit was painted Armco Steel Corp and I worked for them for a number of  years, so it has a sentimental interest.

But basically I put in new mechanisms using the existing frames rather than change the MTH block drives.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×