I little more progress. Once I got the workbench top cleared, I saw how I could rearrange things so I can get to the cabinets and drawers. I'll simply move them all together and place them 6' from the left end. That way they'll be under the 30" deep section. I'll add some support legs on the left side of the framing to hold that section. It's 114° out there now, so tomorrow I'll clear off the shelves and figure out how I'm going to rearrange those. There are 3 units, but I think 1 is going to get moved. To the left of the first photo is the door and next to that is a 6' wall that is begging for some shelves.